train
The world according to cdlu

Topics

columns elections environment essays foreign guelph highways internet leadership legal linux military money musings ottawa politics presentations radio reform satire transit tv unity

Recent entries

  1. Resettled
  2. Keeping Track - Lawn mowers: our most pampered and successful pets
  3. Keeping Track - The Rails of the Royal City
  4. Keeping Track - Bus system overhaul coming to Guelph while GO station might go to Lafarge after all
  5. Keeping Track - Sikh Temple issue column
  6. Keeping Track - Why Canada should adopt the Turks and Caicos
  7. Keeping Track - Rethinking the commute
  8. Keeping Track - there is always more to discuss
  9. Transportation planning leaves a lot to be desired
  10. A sombre anniversary
  11. Weighing civic politics, punditry
  12. Column: GO service is coming to Guelph
  13. GO Transit EA study for Georgetown to Kitchener expansion complete
  14. Column on UK vs CA rail service
  15. BC defeats PR nearly as soundly as PEI and Ontario
  16. older entries...

Associations

Guelph Blogs
Bring GO service to Kitchener-Waterloo
Progressive Bloggers
Liblogs

Header images

Bloggers' chat

Latest comments

Michael D on Keeping Track - Bus system overhaul coming to Guelph while GO station might go to Lafarge after all
Steve Host on Keeping Track - Bus system overhaul coming to Guelph while GO station might go to Lafarge after all
G. T. on Abolish the Ontario Municipal Board
Anonymous on The myth of the wasted vote
fellow guelphite on Keeping Track - Rethinking the commute

Links of interest

  1. 2009-03-27: The Mother of All Rejection Letters
  2. 2009-02: Road Worriers
  3. 2008-12-29: Who should go to university?
  4. 2008-12-24: Tory aide tried to scuttle Hanukah event, school says
  5. 2008-11-07: You might not like Obama's promises
  6. 2008-09-19: Harper a threat to democracy: independent
  7. 2008-09-16: Tory dissenters 'idiots, turds'
  8. 2008-09-02: Canadians willing to ride bus, but transit systems are letting them down: survey
  9. 2008-08-19: Guelph transit riders happy with 20-minute bus service changes
  10. 2008=08-06: More people riding Edmonton buses, LRT
  11. 2008-08-01: U.S. border agents given power to seize travellers' laptops, cellphones
  12. 2008-07-14: Planning for new roads with a green blueprint
  13. 2008-07-12: Disappointed by Layton, former MPP likes `pretty solid' Dion
  14. 2008-07-11: Riders on the GO
  15. 2008-07-09: MPs took donations from firm in RCMP deal
  16. older links...

Protecting The Option For Future Interchanges And Grade Separations In The Hanlon Corridor City Of Guelph
Report 10 of the Guelph Transportation Plan, June 1974.

Guelph-Hanlon Awareness Group

Functional Planning Study of the Hanlon Expressway. Guelph, 1969

Guelph Transportation Plan of 1974

Report 10: Protecting The Option For Future Interchanges And Grade Separation In The Hanlon Corridor City Of Guelph
Report 12: Truck Traffic In Guelph
Report 14: Rail Service in Guelph

FRONT COVER
Title page
Table of Contents - page 1
Table of Contents - page 2
List of Figures
List of Plates
SUMMARY
1. Summary - page 1
2. Summary - page 2
INTRODUCTION
3. Introduction
4. Introduction: Hanlon Expressway, Figure 1
5. Introduction
HISTORY OF THE HANLON EXPRESSWAY
6. History of the Hanlon Expressway
7. History of the Hanlon Expressway
REGIONAL ROADS
8. Regional Roads
9. Regional Roads: Existing Highway Routes, Figure 2
10. Regional Roads
CONSTRAINTS AND CONTROLS
11. Constraints and Controls
12. Constraints and Controls
13. Constraints and Controls: Major Traffic Generators, Figure 3
14. Constraints and Controls
15. Constraints and Controls: Railway Lines, Figure 4
16. Constraints and Controls
THE HANLON CORRIDOR CONCEPTS
17. Hanlon Corridor Concepts
18. Hanlon Corridor Concepts: Hanlon Concepts, Figure 5
19. Hanlon Corridor Concepts
20. Hanlon Corridor Concepts: 1991 A.A.D.T. Volumes, Figure 6
21. Hanlon Corridor Concepts
22. Hanlon Corridor Concepts
23. Hanlon Corridor Concepts
24. Hanlon Corridor Concepts
25. Hanlon Corridor Concepts
26. Hanlon Corridor Concepts
27. Hanlon Corridor Concepts
THE PREFERRED CONCEPT
28. The Preferred Concept
29. The Preferred Concept
30. The Preferred Concept
31. The Preferred Concept
32. The Preferred Concept
33. The Preferred Concept
34. The Preferred Concept
35. The Preferred Concept
36. The Preferred Concept
37. The Preferred Concept
38. The Preferred Concept
RAILWAY CROSSINGS
39. Railway Crossings
40. Railway Crossings
41. Railway Crossings
42. Railway Crossings: Preferred Railway Access Scheme, Figure 7
43. Railway Crossings
CONCLUSIONS
44. Conclusions
45. Conclusions
PLATE INDEX
Plate 1 - Lewis Road collector (Massey-Woodlawn)
Plate 2 - Lewis Road collector and interchange (Speedvale-Massey)
Plate 3 - Willow Rd interchange and Imperial Rd/Hanlon overpass
Plate 4 - Highway 24/6 interchange (1969 plan)
Plate 5 - College Ave flyover
Plate 6 - Original Stone Rd interchange plan (current plan)

Google
 
Web cdlu.net

(RSS) Website generating code and content © 2006-2009 David Graham <cdlu@railfan.ca>, unless otherwise noted. All rights reserved. Comments are © their respective authors.